Project #1: Physicians Hospital of Murrieta/Loma Linda University Medical Center
225,000 SF, five-story, 106 bed, acute care hospital with heavy foundations and slab on metal deck completed in 3rd Qtr 2009.
Total reinforcing steel requirement: 600 tons
Project #2
Tilt-up construction methods were used to build three industrial distribution buildings in Riverside, CA totaling over 750,000 SqFt completed during the 3rd Qtr 2007.
Total reinforcing steel requirement: 1000 tons
Project #3
In Ontario, CA the Ontario Towne Center-Parcel A2 (mixed use structure) project consisted of a subterranean parking garage with over 95,000 SqFt podium deck completed in 4th Qtr 2007.
Total reinforcing steel requirement: 616 tons
Project #4
Multiple deck construction with subterranean parking and two elevated decks is underway in Moore Park, CA and scheduled to complete during 2nd Qtr 2008.
Total reinforcing steel requirement: 281 tons.
Project #5
Along the beautiful pacific coast in Malibu, CA twelve caissons 89ft long by 5ft diameter were installed as part of a project to help preserve natural land formations and reduce soil erosion to support the roadway during 4th Qtr 2007.
Total reinforcing steel requirement: 201 tons.